Interface: US CBP Inspection Administration Systems - CRQ CV Electronic Clearance System
Architecture Flow Definitions
inspection results (Proposed)
Report of results of border inspection on a particular load.
pre-arrival notification (Proposed)
Identification of a vehicle or driver that is approaching a border crossing.
safety inspection report (Proposed)
Report containing results of commercial vehicle safety inspection. The information may be provided as a response to a real-time query or proactively by the source. The query flow is not explicitly shown.
screening results (Proposed)
Results of commercial vehicle screening event at a border crossing - reports clearance event data regarding action taken at border, including acceptance or override of system decision, and date/time stamp.