Interface: MTQ Maintenance Vehicles (SGEC-E) - MTQ Roadweather Systems (SMR)

MTQ Maintenance Vehicles (SGEC-E) to MTQ Roadweather Systems (SMR) Interface Diagram

Architecture Flow Definitions

environmental sensor data  (Existing (Partial))  

Current road conditions (e.g., surface temperature, subsurface temperature, moisture, icing, treatment status) and surface weather conditions (e.g., air temperature, wind speed, precipitation, visibility) as measured and reported by fixed and/or mobile en

environmental sensors control  (Existing (Partial))  

Data used to configure and control environmental sensors.

maint and constr dispatch information  (Existing (Partial))  

Information used to dispatch maintenance and construction vehicles, equipment, and crews and information used to keep work zone crews informed. This information includes routing information, traffic information, road restrictions, incident information, e

maint and constr dispatch status  (Existing (Partial))  

Current maintenance and construction status including work data, operator status, crew status, and equipment status.

maint and constr vehicle operational data  (Existing (Partial))  

Data that describes the maintenance and construction activity performed by the vehicle. Operational data includes materials usage (amount stored and current application rate), operational state of the maintenance equipment (e.g., blade up/down, spreader

maint and constr vehicle system control  (Existing (Partial))  

Configure and control data that supports remote control of on-board maintenance and construction vehicle systems and field equipment that is remotely controlled by the vehicle. For example, the data can be used to adjust material application rates and sp